March 04, 2019

Design proposals for new kitchen bay and balcony extension to country property, Woodgreen, Fordingbridge

Client seeks to extend and improve existing kitchen layout to create family/dining areas with open links to the landcape,  whilst also improving first floor balcony arrangement to master bedroom.

March 01, 2019

Planning secured for internal re-modelling and link building at Hockeys Farm Shop, Ibsey

Client seeks to provide new link building between meet preparation and Farm Shop/Servery areas to improve service offer to visitors.

February 28, 2019

APPEAL VICTORY for single storey rear and side extensions to 25 Bickerley Road, Ringwood

Client seeks to extend existing 1930's semi detached home within Ringwood Conservation Area, addressing Bickelrley Common - housing new Kitchen/Dining/Family space overlooking rear garden.

January 11, 2019

Planning secured for re-modelling to Holly Cottage, Cowpitts Lane, Ringwood

Client seeks to remodel existing 19th Century Cottage in Ringwood Conservation Area - works to include removal of previous poor quality 20th Century additions and opening out of interior volumes to create 21st Century family home.

December 21, 2018

Planning secured for single and double storey side extensions to 58 Parsonage Barn Lane, Ringwood

Client seeks to extend existing 1930's semi detached home within with GF and 1F side extensions, on prominent corner addressing 2 principal highways.

November 27, 2018

Planning secured for re-modelling and loft conversion to 310 Sandbanks Road, Lilliput, Poole

Client seeks to transform existing 1930's detached family home into contemporary free flowing family property to meet current family lifestyles. Modifications to include new loft conversion overlooking Poole Bay.

November 08, 2018

Planning submitted for re-modelling to existing + new first floor suite at 12 North Poulner Road, Ringwood

Client seeks to remodel existing first floor volumes to improve and create additional bedroom and bathroom accommodation. To include new first floor level above lounge to provide master en suite.

October 30, 2018

Planning secured for single storey rear extension to 98 Northfield Road, Ringwood

Client seeks to replace existing clutter of dated conservatory and kitchen porch with new, expansive free flowing contemporary Kitchen/Dining/Family space overlooking substantial rear gardens. 

October 21, 2018

Planning secured for new Equestrian Menage at Milton Abbey School, Milton Abbas

Installation of menage facilities for training horses, linked to the existing stables facility at the School. Our work included the 2D Cad and build up drawings from the technical perspective, alongside 3D imagery for heritage Impact and Visual assessments.

October 02, 2018

Planning submitted for creation of new dwelling to 53 Parsonage Barn Lane, Ringwood

Client seeks to create new separate dwelling within existing garden plot. Dwelling seeks to meet local needs for compact, sustainable and affordable housing provision.

September 27, 2018

Planning secured for 2 storey side extension to 142 Southampton Road, Ringwood

Client seeks to replace existing garage with 2 storey side extension accommodating Master Suite to 1F and new Kitchen/Dining/Family space overlooking gardens to GF

September 11, 2018

APPEAL VICTORY for extension above existing garage in National Parks

RiB ARCHITECTURE successfully challenged NFNPA with regards to application of 30% 'post 1982' policy and the depth of information required to substantiate. Great outcome for homeowners now looking forward to their new master suite, and remaining in their beloved home.

September 10, 2018

Planning secured for Extensions + re-modelling to 25 Alder Drive, Alderholt

Client seeks to extend both on the ground at both front and rear, whilst remodelling the existing interior to create a more open, free flowing home for their expected new family.

July 01, 2018

-Planning secured for Extensions + re-modelling to Fir Glen Road, Verwood

First time approval for expansion of existing GF footprint and first floor build over.

June 21, 2018

Planning secured for Extensions + re-modelling to 63 Parsonage Barn Lane

Client seeks to extend and open up the existing plan to the rear to create a contemporary free flowing family space overlooking the substantial rear gardens.

May 21, 2018

Planning secured for new Cricket Training installation at Milton Abbey School

Following many months of engaged consultations with the LPA and Historic England successful outcome with consent granted. Great team effort between RiB ARCHITECTURE and our friends at Milton Abbey!

April 03, 2018

Planning secured for new Workshops, Dawson Engineering, Burley

Planning secured for workshops to existing garage in sensitive context in the National Parks. Great Teamwork by RiB ARCHITECTURE, Client and Planners led to success despite local concern(s).

March 09, 2018

Planning secured for Car Port, Wood Store + Associated externals, Woodpeckers, Lover

Work comprises new timber framed structure housing parking for 2 cars, wood store along with associated externals (gates, fencing) and landscaping revisions to existing hedgerow and verge.

February 07, 2018

Planning submitted for New Dwelling in Severed Plot, 6 Butlers Lane, Ringwood

Client seeks to sever the existing rear garden plot to family home to accommodate sustainable dwelling with access from the rear.

December 22, 2017

Planning secured for Hightown park re-modelling, Poulner hill, Ringwood

Kitchen/Orangery overlooking gardens, Lounge extension and Study/Garden Room along with re-planning of first and second floor levels to create new Master Suite and walk out balcony.

November 09, 2017

Planning secured for remodelling to 51 Parsonage BarnLane, Ringwood

Work comprises new porch to front, 2 storey side and rear extensions to provide new bedrooms on 1F and contemporary free flowing Family Spaces to GF overlooking the garden.

October 05, 2017

PreApplication submission sketch for Laneside, Milford-on-sea

Contemporary 2 storey 'cube' insertion into existing Ravenscroft property in the Barnes Lane Conservation Area, housing free flowing family space to the GF and master suite to 1F

September 25, 2017

Planning secured for lakeside property in Ringwood

Work comprises removal of existing poor quality extensions and replacement with contemporary free flowing Kitchen/Dining/Lounge spaces overlooking gardens and lake beyond.

September 04, 2017

Planning secured for Replacement Dwelling in Green belt location

Proposals replace the timber framed structure, with new contemporary re-imagining. With a substantive increase in footprint, the design manages still to reflect the original simplicity of proportion and scale.

September 03, 2017

Planning submitted for extensions to Chaplins Bar, Boscombe

Proposals to extend existing award winning gastro pub/entertainments venue into adjacent premises, to build on existing provision.

August 17, 2017

Planning secured for Art Gallery and studio spaces, Milton Abbey School

Transformation of Art Block to provide Art Gallery and entrance hall, conservatory studio and sculpture gallery to the rear plus improvements to historic fabric.

July 24, 2017

Planning secured for Extension in Verwood, Dorset

Proposals involve substantial extension to the side of the existing bungalow to provide new Kitchen/Family/Dining space with vaulted interior, along with new master suite, bathroom and utility.

July 24, 2017

Planning secured for house transformation, Seymour Road, Ringwood

Transformation of existing 3 bedroomed bungalow into substantial 5 bedroomed family home with increased street presence and contribution.

June 22, 2017

Planning secured for listed cottage in SSSI location at Mill Lane, Hurn

Client sought to obtain consent for multi-vehicle garaging within rear garden of cottage. Hurdles such as setting within Conservation Area and Site of scientific Interest were successfully overcome with sensitive design, negotiation and presentation of proposals.

April 28, 2017

PreApplication submission for new Green Pavilion, Ringwood

Sketch proposals for PreApp submission, comprising sever of existing garden plot and accommodation of sustainable pavilion home overlooking open fields to the rear. (Screen grab from animation file).

November 09, 2016

Planning secured for Stable Block conversion, Milton Abbey school

Following in depth consultations with the School, LPA and H.E. consent was achieved on 09.11.2016. A great Team effort from RiB ARCHITECTURE and our friends at Milton Abbey.

November 02, 2016

Planning secured for Re-modelling within National Parks.

Design has '2 faces' - the first to the road maintains the scale and character of this family home. To the rear the spaces and volumes open up to create a double height free flowing interior orientated towards the rear gardens and private woodland.

September 29, 2016

Planning secured for Extensions to Back of Beyond

Clients wished to extend and improve existing family home on family owned camp site business. Proposals included new Lounge, Conservatory and first floor master suite and terrace.

July 24, 2016

Planning secured for North Lodge, Hurn Road

First floor additions to this character property creating new wing addressing the lane, and much needed family bathroom at this level. Layered roof creates visual coherence with original design and warmly received by planners.

June 27, 2016

Planning secured at 96 Parsonage Barn Lane, Ringwood

The substantial extension reflects the original local Ringwood vernacular whilst providing  additional accommodation comprising Family Room, Study, Office/Den, Utility, Store and WC on GF and Master Suite to 1F

May 29, 2016

Conceptual sketch proposals for Learning Atrium, Milton Abbey School

Sketch conceptural ideas for future learning and resource atrium, produced for funding sourcing and promotional mediums.

May 24, 2016

Planning secured for Passive House, St Leonards

Existing garden plot severed to accommodate new open plan, vaulted Passive House set in pine copse.

January 29, 2016

Planning Secured for Vaulted Kitchen/Family Room and Master Suite in Loft

Large vaulted extension provides beautiful Kitchen/Dining/Family Room overlooking rear gardens. Internal re-modelling provides access for master suite in loft, accessed via new 3 storey Oak and glass staircase.

January 20, 2016

Planning secured for Re-modelling to Woodpeckers, Lover

Extensions and re-modelling to existing in sensitive National Parks location. Success achieved through sensitive design, consultation and presentation of proposals.

January 12, 2016

Planning secured for first floor transormation, 51 Northfield, Ringwood

Design comprises first floor addition, along with ground floor conservatory and free flowing kitchen/family room to rear gardens and the lake - design utilising timber technology and apex glazing to create a light, transparent visual.

November 24, 2015

Design proposals for 15 Northfield Road, Ringwood

Extensions to rear of existing family home to provide ground floor suite for teenage daughter with library area, along with Kitchen/Family/Dining spaces overlooking generous rear gardens.

October 13, 2015

Design proposals for Toad Cottage, Ringwood

Proposals comprised conversion of the existing garage, extension of first floor loft space and link conservatory to provide self contained annexe with link to host dwelling.

April 15, 2009

Planning secured for Riverside Road, West Moors.

Transformation of existing 4 bed property to 6 bed family home. Challenges included designing within the West Moors Conservation Area and high flood risk area adjacent to the river.

July 08, 2007

Planning secured for 29 Broadshard Lane, Ringwood

Transformation of existing 2 bedroomed bungalow into large 2 storey 5 bedroomed family home, located on one of Ringwood's premier (and most highly considered) residential lanes.

March 08, 2007

New build dwelling in National Parks, Ringwood

Situated on the outskirts of the market town, the new dwelling accommodates a previously vacant site. Utilising the levels within the site the design is traditional in approach to the lane whilst contemporary and light in contrast to the rear gardens and views out.

October 11, 2006

Planning secured for new annexe at 31 Broadshard Lane, Ringwood

Proposals comprise conversion and extension of existing garage into self contained annexe (bedroom, en suite and study), with glazed conservatory link to existing house - this space shared with hist family.

December 09, 2004

Planning secured for re-modelling of detached house in Much Hoole

Proposals form bold insertions and additions to recently 4 bed executive property on the outskirts of Southport. In particular, the contemporary porch and extension to the fore create a unique 'street presence' to the cul-de-sac.